Last year, we successfully delivered several design projects, including the Puumala 110 kV switching station, the new Utanen 110 kV substation, the Nuojuankangas 110 kV substation, and the expansion of the Koivisto substation’s 110 kV switchgear. Around the turn of the year, we conducted foundation type definitions, foundation design, and third-party inspections for several power …